Professional Hi-Resolution Photography
Flawless Photography LLC

Flawless Photography
Sharper than reality
Flawless Photography
Sharper than reality


NRD: Assembly Bunker - 0001
From
$49.99
Description:
This bunker (Building 232) served as the United States' primary nuclear weapon assembly facility at North River Depot until its deactivation in September 1994.
Here, plutonium pits (fissile cores), high-explosive lenses, tritium reservoirs, neutron generators, lithium deuteride secondaries, and beryllium reflectors were precision-mated with reentry vehicle bodies and warhead casings in a controlled, high-security environment.
Final assembly occurred just prior to transport via secure convoy to the Loring AFB runway, where fully armed weapons were loaded onto strategic bombers or alert aircraft.The process followed strict two-person integrity rules, with each step verified by nuclear weapons specialists under constant surveillance.
Location: Limestone, Maine - North River Depot (Loring, AFB)
Date: September 2, 2025.
Pricing Notes:
The listed price is for a 12"x18" Photo print + matboard.
Final cost will adjust based on your customization, including:
Larger print sizes
Premium framing options
Alternative mediums (e.g., acrylic, canvas)
Select your preferred options during checkout for an updated total.
Print Options: See Print Options HERE
Frames: See available frames HERE
Textile Prints: Standard Black Frame Included.
Quantity
Location:
Limestone, Maine
Camera
Sony A7RV
- 61MP Full-Frame Exmor R BSI CMOS Sensor
- BIONZ XR & AI Processing Unit
- AI-Based Real-Time Tracking AF System
- 8K 24p, 4K 60p, FHD 120p 10-Bit Video
- 4K 16-Bit Raw Output; S-Log3/S-Cinetone
- 9.44m-Dot EVF with 120 fps Refresh Rate
- 3.2" 4-Axis Multi-Angle Touchscreen LCD
- 10 fps Shooting with AF/AE Tracking
- 8-Stop 5-Axis Image Stabilization
Lens
Sony FE 24-70mm f/2.8 GM II Lens
Photographer
J. Triplett
